A tenant improvement set is reviewed from the code summary out. When the occupancy, the occupant load and the exits agree on every sheet, the rest of the review goes quickly. When they don’t, the set comes back before anyone reads the details. This is the list to run before you submit an office, retail or restaurant fit-out in Washington.

The adopted codes named (2021 IBC as amended by WAC 51-50, and the commercial energy code, WSEC-C), then construction type, occupancy, sprinklered or not, occupant load, egress width with the arithmetic shown, exits required and provided, and the plumbing fixture count.
Every room tagged with its use, area, load factor and occupant load. Exits with required and provided width, travel distance and common path drawn from the most remote point, rated walls keyed to a legend, and exit signs, emergency lights and extinguishers placed.
Enlarged restroom plans with turning space and clear floor spaces dimensioned, and elevations with every mounting height. The accessible route runs from parking to the entrance. Shared mall restrooms need the landlord’s letter.
The cover lists what is under a separate permit or submitted later, and who designs it: fire sprinkler, fire alarm, signage and, for food service, the hood and suppression, walk-in coolers and the health department plan review.
Occupancy left blank, or a construction type that differs between sheets. Egress width copied from another job. One exit drawn once the occupant load needs two. Room areas that differ between the life safety plan, the floor plan and the room schedule. Code notes from another state left in the template. A schedule of light fixtures with none placed on the ceiling plan.
Food service adds an enlarged kitchen plan with every piece of equipment numbered and scheduled, the hood shown on the plan, the ceiling plan and the roof, hand sinks within reach of every station, floor sinks and the grease interceptor, and washable health department finishes stated room by room. Fixed seating is counted by seat, not by area.
Pretiva drafts the set in your own Revit from your model and computes the areas, the occupant load and the egress widths once from the model, so every sheet agrees. Then it checks every sheet against the city’s rules before the set goes in. What it can’t confirm from your model comes back to you as a question.
The 2021 IBC as amended by WAC 51-50, with the WSEC-C for energy, unless the city adopts its own (Seattle does). Confirm the edition the project is vested under.
Almost always: it is the sheet a plans examiner checks first. It shows the occupant load, the exits, travel distance and the rated walls for the space.
An enlarged kitchen plan with an equipment schedule, the hood and its grease duct route, the grease interceptor, health department finishes, and a separate health department plan review.
Your team reviews every sheet, and a licensed professional stamps when the set needs one. Pretiva never stamps, signs or issues anything.